Integrated System News

Important Future Dates
5/10, 6 pm to 5/11, 6 am

UVA Marketplace unavailable

5/11

Production down until 3pm, ODS available as usual

 

Last Updated:

05/08/08, 4:00 p.m.

Extended downtime May 11: The Integrated System will be down this Sunday, May 11th for an additional 3 hours - until 3pm - for a hardware upgrade.  ODS will be available as usual (from 12:00 noon - 6:30 p.m.).

All UVA HRMS Timekeepers, please note: because the system will be unavailable later than normal this week, your timekeeper responsibility will remain active this Sunday until 8pm for timecard entry.

05/05/08, 10:00 a.m.

IS User Survey Drawing Winner: Elizabeth Wharton from ITC won the $50 drawing for a Simon gift card!

05/02/08, 8:30 a.m.

PO Shoppers: The UVA Marketplace will be unavailable from 6:00 p.m. on Saturday, May 10 through 6:00 a.m. on Sunday, May 11 while maintenance is performed on the SciQuest catalog system.

 

 

History

05/01/08, 8:00 a.m.

Month-end close is complete. ODS contains data through April 30.

4/24/08, 11:50 a.m.

HR Audit reports are now available.

4/24/08, 10:15 a.m.

HR Audit reports are currently unavailable.Work is underway to resolve the problem and we will post here when the reports become available.

4/22/08, 8:50 a.m.

Month-end close: At 2:00 p.m. on Wednesday, April 30, all users will be disconnected temporarily from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Thursday, May 1. Click here for a list of deactivated and active responsibilities.

4/16/08, 9:55 a.m.

Timekeepers and HRMS Specialists: Due to a welcome error, paychecks for the biweekly pay period of March 26 through April 8 were direct deposited into employee bank accounts on Tuesday, April 15, instead of Friday, April 18.  This affects temp, wage, student, and certain goal pay employees.  The funds are available for use now and all paycheck amounts are correct.  If you or the affected employees have any questions, contact Payroll at 924-4350.

4/6/08, 3:10 p.m.

Production is now available. Per the prior downtime notice, ODS will be unavailable for the remainder of the day.

4/3/08, 1:00 p.m.

Extended downtime Sunday, April 6: In order to increase the space available for production data, there will be extended downtime for both production and ODS this Sunday, April 6th. ODS will be unavailable all day, and production is planned to be unavailable until 3:00 p.m.

04/01/08, 8:150 a.m.

Month-end close is complete. ODS contains data through March 31.

3/20/08, 1:50 p.m.

Month-end close: At 2:00 p.m. on Monday, March 31, all users will be disconnected temporarily from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Tuesday, April 1. Click here for a list of deactivated and active responsibilities.

03/17/08, 11:25 a.m.

The phone issues with the Integrated System Customer Support Center are resolved - all calls are now routing properly.

03/17/08, 10:15 a.m.

Due to phone issues, calls to the Integrated System Customer Support Center are intermittently failing. Work is underway to attempt to resolve the problem.

03/01/08, 9:40 a.m.

Month-end close is complete. ODS contains data through February 29.

2/26/08, 1:40 p.m.

Production interruption of service: from 1:07p.m. until 1:31p.m. today, the production application was unavailable due to system complications related to a power failure in Carruthers Hall.

2/25/08, 10:40 a.m.

Month-end close: At 2:00 p.m. on Friday, February 29, all users will be disconnected temporarily from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Saturday, March 1. Click here for a list of deactivated and active responsibilities.

2/16/08, 12:00 p.m.

Due to technical difficulties associated with patching, the application will be available at 12:30 p.m. today rather than noon.

2/12/08, 4:45 p.m.

Friday, February 15, is the last business day you will be able to use Discoverer 4.1.  Beginning Monday, February 18, you must be on the new version, 10.1.  You are encouraged to log on to the new version and run a report from the database to ensure you are ready for the transition. For instructions, click here.

02/01/08, 8:25 a.m.

Month-end close is complete. ODS contains data through January 31.

1/22/08, 1:00 p.m.

Month-end close: At 2:00 p.m. on Thursday, January 31, all users will be disconnected temporarily from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Friday, February 1. Click here for a list of deactivated and active responsibilities.

1/14/08, 5:10 p.m.

Selected Production Reports Unavailable on Tuesday : The following Production reports will be temporarily unavailable between 4:30 and 6:00 p.m. on Tuesday, January 15th:

UVA PA Installments vs Project Funding vs Expenditures

UVA PA Revenue vs Installments vs Project Funding vs Expenditures

UVA Cash Balance Report by Project (Discoverer version will be available)

UVA Consolidated Cash Balance Report by Project

1/2/08, 5:30 p.m.

Extended downtime weekend of 1/5: The Integrated System will be unavailable from midnight on Saturday, January 5, until noon on Sunday, January 6, for system maintenance. ODS will be available during normal published hours.

01/02/08, 9:55 a.m.

Month-end close is complete. ODS contains data through December 31.

12/20/07, 9:25 a.m.

Month-end close: At 2:00 a.m. on Monday, December 31, all users will be disconnected temporarily from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 a.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Tuesday, January 1. Click here for a list of deactivated and active responsibilities.

12/12/07, 9:25 a.m.

ODS Unavailable:  The ODS refresh did not complete last night.  We are refreshing it this morning.  Until it is finished, you may receive the following message when you submit a Discoverer report:  “No Rows Returned”.  The refresh should be complete by noon today.

12/10/07, 7:00 a.m.

Production is available.

12/09/07, 2:40 p.m.

Production not available today. As a result of continuing technical difficulties, Production will not be available until 7:00 a.m. Monday. We apologize for the inconvenience.

12/09/07, 12:00 p.m.

Production available at 2:00 p.m. Because regularly scheduled weekend maintance is not yet complete, Production will not be available today until 2:00 p.m. We apologize for the inconvenience.

12/2/07, 12:00 p.m.

ODS unavailable: ODS is unavailable today as we work to resolve a technical problem. Production is available today during normal scheduled hours of availability (12 p.m. to 6:30 p.m.). We expect ODS to be available again at 7 a.m. tomorrow morning.

12/01/07, 10:00 a.m.

Month-end close is complete. ODS contains data through November 30.

11/26/07, 4:00 p.m.

Month-end Close: At 2:00 p.m. on Friday, November 30, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Saturday, December 1. Click here for a list of deactivated and active responsibilities.

11/19/07, 3:20 p.m.

Planned Downtime Tuesday morning: Production will be unavailable from 5:00 to 6:00 a.m. on Tuesday, November 20, for maintenance. ODS will be available.

11/12/07, 9:15 a.m.

The UVa Marketplace upgrade is complete, and ODS is available.

Extended downtime weekend of 11/16: The Integrated System will be unavailable from 2:00 a.m. Saturday morning, November 17, until noon on Sunday, November 18, for system maintenance. ODS will be available during normal published hours.

11/2/07, 9:00 a.m.

UVa Marketplace upgrade and ODS extended downtime for weekend of 11/10: UVa Marketplace will be unavailable from 10:00 p.m. on Friday, November 9, until noon on Sunday, November 11. ODS will be unavailable all day on Sunday, November 11, for maintenance. It will be available at 7:00 a.m. on Monday, November 12.

11/01/07, 7:45 a.m.

Month-end close is complete. ODS contains data through October 31.

10/24/07, 8:53 a.m.

Month-end Close: At 2:00 p.m. on Wednesday, October 31, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Thursday, November 1. Click here for a list of deactivated and active responsibilities.

10/12/07, 11:40 a.m.

HRMS SPECIALISTS & FACULTY/STAFF REVIEWERS: Your responsibilities have been activated following the completion of payroll processing for the Semi-monthly Paid Monthly payroll ending 09-Oct-2007.

10/12/07, 8:40 a.m.

HRMS SPECIALISTS & FACULTY/STAFF REVIEWERS: Payroll processing for the Semi-monthly Paid Monthly payroll ending 09-Oct-2007 has not yet completed so your Integrated System responsibility will not be enabled on Friday morning as usual.  When the payroll is complete, we will enable your responsibility and notify you.

TIMEKEEPERS - PRINTING OF OCT 24 TIMESHEETS: Because of delays in leave processing, timesheet source documents for the pay period ending 24-Oct-2007 will not be available for printing out of Discoverer until Monday morning. 

10/11/07, 11:00 a.m.

The following Production reports are temporarily unavailable while financial transactions are being processed:

  • UVA PA Installments vs Project Funding vs Expenditures
  • UVA PA Revenue vs Installments vs Project Funding vs Expenditures
  • UVA Cash Balance Report by Project
  • UVA Consolidated Cash Balance Report by Project

10/11/07, 8:25 a.m.

The nightly batch processes for financial transactions were not run last night because of resource constraints that caused a number of requests to run far longer than normal. Those transactions will be processed tonight. The ODS refresh occurred on schedule, and ODS Discoverer reports contain current information.

10/01/07, 8:00 a.m.

Month-end close is complete. ODS contains data through September 30.

9/25/07, 9:30 a.m.

Month-end close: At 2:00 A.M. on Sunday, September 30, all users will be temporarily disconnected from the Integrated System as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back at noon, Sunday, September 30, the normal hour that the system becomes available on Sundays. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Monday, October 1, 2007.  Click here for a list of deactivated and active responsibilities.

9/24/07, 5:45 p.m

The following financial reports will be unavailable in Production from 12:00 noon on Tuesday, September 25 until 7:00 am, Wednesday, September 26:

UVA PA Installment vs Project Funding vs Expenditures
UVA PA Revenue vs Installment vs Project Funding vs Expenditures
UVA Cash Balance Report by Project
UVA PA Consolidated Cash Balance Report

All ODS reports are available including the IS.GL Cash Balance by Project report.

9/21/07, 2:00 p.m.

FM Discoverer Report Users:  A new FM_Project BBA Summary report has been published. It may be used in place of the FM_Project BBA by Expenditure Type report for month-end reconciliations. See Report Announcements for further details.

9/17/07, 10:25 a.m.

Production is now available.

9/17/07, 10:10 a.m.

Production unavailable: The Integrated System is currently unavailable as we work to resolve a technical problem which began at approximately 10:07 this morning. We expect it to be available at 10:35 a.m.

9/03/07, 9:30 a.m.

Month-end close is complete. ODS contains data through August 31.

8/29/07, 12:15 p.m.

Production is now available.

8/29/07, 11:40 a.m.

Production unavailable: The Integrated System is currently unavailable as we work to resolve a technical problem which began at approximately 11:15 this morning. We expect it to be available at approximately 12:30 p.m. You may continue to run reports in the ODS. We will update this website when the system is back in operation.

8/28/07, 11:30 a.m.

Production is now available.

8/28/07, 11:00 a.m.

Production unavailable: The Integrated System is currently unavailable as we work to resolve a technical problem which began at approximately 8:30 this morning. We expect it to be available at approximately 11:30 a.m. You may continue to run reports in the ODS. We will update this website when the system is back in operation.

8/26/07, 11:00 a.m.

The Integrated System and ODS are now available.

8/24/07, 11:30 a.m.

Extended downtime weekend of 8/25: The Integrated System will be unavailable from 2:00 a.m. Saturday morning, August 25, until noon on Sunday, August 26, for system maintenance. ODS will be available during normal published hours.

Month-end Close: At 2:00 p.m. on Friday, August 31, all users will be disconnected temporarily from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Saturday, September 1. Click here for a list of deactivated and active responsibilities.

8/15/07, 11:30 a.m.

Extended downtime weekend of 8/25: The Integrated System will be unavailable from 2:00 a.m. Saturday morning, August 25, until noon on Sunday, August 26, for system maintenance. ODS will be available during normal published hours.

8/10/07, 1:40 p.m.

The IS.LD.Pay & Distribution Adj History report does not currently reflect the biweekly payroll transactions for the pay period 18-Jul-2007 through 31-Jul-2007. We have resolved a related encumbrance issue and the report should display those transactions on Monday, August 13.

8/7/07, 8:30 a.m.

Extended ODS downtime cancelled for weekend of August 11-12: The system upgrade has been postponed.

8/3/07, 10:50 a.m.

Extended ODS downtime weekend of August 11-12: ODS will be unavailable beginning at 7:00 p.m. Friday night, August 10, for a system upgrade. ODS will be available again at noon on Sunday, August 12.

7/31/07, 8:00 a.m.

Month-end close is complete.

7/30/07, 4:45 p.m.

Month-end Close: At 2:00 p.m. on Tuesday, July 31, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Wednesday, August 1. Click here for a list of deactivated and active responsibilities.

7/29/07, 4:20 p.m.

UVa Marketplace is now available.

7/29/07, 12:00 Noon

The Integrated System is now available. UVa Marketplace is not available at this time.

7/26/07, 9:30 a.m.

Extended downtime weekend of 7/27: The Integrated System, including UVa Marketplace, will be unavailable beginning at 10:00 p.m. Friday night, July 27, for a UVa Marketplace software upgrade and other system maintenance. Production will be available again at noon on Sunday, July 29. UVa Marketplace will be available at 2:00 p.m. on Sunday.

On Saturday morning, July 28, ODS will be available at 9:00 a.m. rather than 7:00 a.m.

Month-end Close: At 2:00 p.m. on Tuesday, July 31, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Wednesday, August 1. Click here for a list of deactivated and active responsibilities.

7/10/2007, 11:40 a.m.

Important alert for award prefixes: SA, SE, SG, SR, SS, LA, LC, LG, LO, LS, EI, DI, FI, LP, SP

The submitting and baselining processes are finished for the 2007-08 Original Budget Load. You may now install, fund, and budget these awards.

7/18/07, 2:00 p.m.

Extended downtime weekend of 7/27: The Integrated System, including UVa Marketplace, will be unavailable beginning at 10:00 p.m. Friday night, July 27, for a UVa Marketplace software upgrade and other system maintenance. Production will be available again at noon on Sunday, July 29. UVa Marketplace will be available at 2:00 p.m. on Sunday.

On Saturday morning, July 28, ODS will be available at 9:00 a.m. rather than 7:00 a.m.

7/16/07, 11:00 a.m.

Time to change your VPN password: July is the month for the once-a-year change of your VPN password. You will receive a reminder email from ITC with instructions.

7/10/2007, 11:40 a.m.

Important alert for award prefixes: SA, SE, SG, SR, SS, LA, LC, LG, LO, LS, EI, DI, FI, LP, SP

The submitting and baselining processes are still executing for the 2007-08 Original Budget Load. For the above award prefixes, DO NOT modify award budgets, project funding, nor the installment values in any manner until a follow-up notification is received confirming completion of the 2007-08 Original Budget Load. We apologize for this inconvenience and appreciate your patience.

7/01/07, 2:30, p.m.

Year-end closing is complete and ODS contains data through 06/30/07. Happy New Year!

Users may experience slow response times because the annual budgets are being loaded and baselined. We appreciate your patience and will update this site when the budget load is complete.

6/29/07, 2:20 p.m.

LD Users: All LD responsibilities, with the exception of UVA LD Labor Schedule Specialist, were disabled on June 21 due to the year-end cut-off date for LD adjustments. All LD responsibilities will be reactivated at 12:00 noon on Sunday, July 1.

6/21/07, 8:55 a.m.

Year-end close: See links above for transaction cut-off dates. Integrated System users with responsibilities that do NOT remain active during month-end close will have those responsibilities deactivated at 6:00 p.m. on Friday, June 29. They will be reactivated at 12:00 Noon on Sunday, July 1.

All other responsibilities will remain active during year-end close. Click here for a list of deactivated and active responsibilities.

At Noon on Sunday, July 1, ODS will contain all data for fiscal year 2007.

6/01/07, 7:55 a.m.

Month-end close is complete. ODS contains data through May 31.

5/29/07, 1:00 p.m.

Month-end Close: At 2:00 p.m. on Thursday, May 31, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Friday, June 1. Click here for a list of deactivated and active responsibilities.

Reminder: PO responsibilities remain active during month-end close.

5/11/07, 9:00 a.m.

Extended downtime: The system will be available on Sunday, May 13, at 2:00 p.m., rather than the normal noon availability due to system maintenance. ODS will be available.

5/1/07, 1:20 p.m.

Lynda Birckhead, Manager of Finance and Administration for the Office of the President, has won the I.S. User Survey drawing for a $50 gift card. Thanks to all who completed the survey. Results will be posted after they have been compiled and analyzed.

5/01/07, 8:20 a.m.

Month-end close is complete. ODS contains data through April 30.

4/24/07, 9:15 a.m.

Month-end Close: At 2:00 p.m. on Monday, April 30, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 2:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at 7:00 a.m. on Tuesday, May 1. Click here for a list of deactivated and active responsibilities.

Reminder: PO responsibilities remain active during month-end close.

4/23/07, 7:30 a.m.

The ODS refresh is still in progress. It is estimated to be complete around 8:00 a.m.

4/18/07, 11:50 a.m.

Due to ongoing issues with the Central Mail Service, you may experience delays in receiving Integrated System notifications. Notifications will process normally when the CMS issue is resolved.

4/2/07, 2:30 p.m.

FM Discoverer Report Users: See Report announcements for details of two new FM reports intended for Principal Investigators of Grant and Contract awards, and for recent changes to the IS.FM_Expenditure Detail by Project & Award reports.

4/02/07, 8:20 a.m.

Month-end close is complete. ODS contains data through March 31.

3/28/07, 4:30 p.m.

System unavailable from 12:30 to 4:00 a.m. tonight: In response to HR issues experienced today, ISDS will be unavailable tonight as a patch is applied. ODS will be available.

3/26/07, 8:45 a.m.

Month-end close: At 6:00 p.m. on Friday, March 30, all users will be temporarily disconnected from the system as we prepare for month-end close. Holders of IS responsibilities that remain active during month-end close may log back on at 6:30 p.m. Responsibilities that do NOT remain active during month-end close will be reactivated at noon on Sunday, April 1. Click here for a list of deactivated and active responsibilities. EXCEPTION for Purchasing responsibilities:

Purchasers: The UVa Marketplace will be unavailable from Friday, March 30, at 10:00 p.m. until 5:00 p.m. on Sunday, April 1.

3/22/07, 2:10 p.m.

Purchasers: The UVa Marketplace will be unavailable from Friday, March 30, at 10:00 p.m. until 5:00 p.m. on Sunday, April 1, as SciQuest (the company that provides the UVa Marketplace catalogs) enhances their infrastructure to improve reliability. This and the March 16th downtime complete the first phase of a two-phase improvement process. SciQuest and we apologize for the inconvenience.

3/19/07, 8:10 a.m.

Cost transfers in the Grants Accounting module will be released on Tuesday instead of Monday this week.

HRMS Specialists and Faculty/Staff Reviewers: The report, PSP: Encumbrance Process Run Results Report, is no longer completing with a status of "Warning."

3/14/07, 4:00 p.m.

PO Shoppers: The UVa Marketplace catalog shopping will be unavailable from 10:00 p.m. on Friday, March 16, until noon on Sunday, March 18, for a software upgrade.

3/13/07, 9:10 a.m.

All Users: Please disregard the warning "Low-level logging is currently enabled." There will be no impact on your work. ISDS is gathering information regarding a technical issue.

3/7/07, 3:20 p.m.

HRMS Specialists and Faculty/Staff Reviewers: The report, PSP: Encumbrance Process Run Results Report, is currently completing with a status of "Warning." This does not reflect a failure of the PSP: Liquidate Encumbrances for Employee Termination process. You may continue to terminate the employee as usual. We will post to this website when this issue is resolved.

3/7/07, 3:20 p.m.

PO Shoppers: UVa Marketplace catalog shopping will be unavailable from Friday, March 16, at 10:00 p.m. until noon on Sunday, March 18, for system maintenance.

3/04/07, 3:00 p.m.

Production is available.

3/04/07, 12:20 p.m.

Production is down. We are working on the issue and hope to have it back up in a few hours. Check the website for status and updates.

3/01/07, 8:05 a.m.

Month-end close is complete. ODS contains data through February 28.

 

 

Please go to the System Archive for more history.